• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial Engineering, International
    • Volume 7, Issue 15
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial Engineering, International
    • Volume 7, Issue 15
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

    (ندگان)پدیدآور
    Abrishamifar, S. Amir
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    308.7کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational constraints for optimization is the uniformity of metallic minerals grade after the blending process. This constraint directly affects the performance of the mineral processing plant. The sequence of extracting ore is usually determined by the order of pushbacks, which should be mined. Metallic minerals' grade in each pushback is stochastic in nature that comes from some statistical errors committed by the sampling. In such situations, decision making about the order of pushbacks for extraction as an exact defined process is not possible. Moreover, the decision-maker should maximize the total Net Present Value NPV as the main objective of mining operations by considering the high performance of mineral processing plant. To deal with such cases, this research proposes a model based on the chance-constrained one-sided goal-programming and the obtained results from this procedure confirms the model's reliability and correctness.
    کلید واژگان
    ORE blending
    Poly-metallic open pit mine
    Chance-constrained programming
    Goal-programming

    شماره نشریه
    15
    تاریخ نشر
    2011-11-01
    1390-08-10
    ناشر
    Islamic Azad University, South Tehran Branch
    سازمان پدید آورنده
    Assistant Professor, Dept. of Mining Engineering, Tehran South Branch, Islamic Azad University, Tehran, Iran

    شاپا
    1735-5702
    2251-712X
    URI
    http://jiei.azad.ac.ir/article_510996.html
    https://iranjournals.nlai.ir/handle/123456789/23462

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب