Volume 2, Issue 3

 

ارسال های اخیر

  • Technical Note: Performance measurement in industrial organizations, case study: Zarbal Complex 

    Tarokh, Mohammad Jafar؛ Nazemi, Eslam (Islamic Azad University, South Tehran Branch, 2006-09-01)
    Industrial organizations are complex systems` where the interactions among the various functions such as Sales, Distribution, Manufacturing, Materials, Finance, Human Resources and Maintenance have to be man-aged towards ...

  • Designing a multi-objective nonlinear cross-docking location allocation model using genetic algorithm 

    Makui, Ahmad؛ Haerian, Laleh؛ Eftekhar, Mahyar (Islamic Azad University, South Tehran Branch, 2006-09-01)
    In this study, a cross-docking system is designed at strategic and tactical levels. For making the strategic decisions, a multi-objective nonlinear location allocation model for cross-docks is presented based on a distri-bution ...

  • An algorithm for multi-objective job shop scheduling problem 

    Fattahi, Parviz؛ Saidi Mehrabad, Mohammad؛ Aryanezhad, Mir B. (Islamic Azad University, South Tehran Branch, 2006-09-01)
    Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization ...

  • Optimum target value of multivariate processes with unequal non-conforming costs 

    Abbasi, Babak؛ Akhavan Niaki, Seyed Taghi؛ Arkat, Jamal (Islamic Azad University, South Tehran Branch, 2006-09-01)
    In quality control charts, the problem of determining the optimum process mean arises when the deviation of a quality characteristic in one direction is more harmful than in the opposite direction. The failure mode in these ...

  • An application of artificial neural network to maintenance management 

    Oladokun, V. O.؛ Charles-Owaba, O. E.؛ Nwaouzru, C. S. (Islamic Azad University, South Tehran Branch, 2006-09-01)
    This study shows the usefulness of Artificial Neural Network (ANN) in maintenance planning and man-agement. An ANN model based on the multi-layer perceptron having three hidden layers and four processing elements per layer ...

  • Lot sizing with rework and different inspection costs 

    Haji, Rasoul؛ Haji, Alireza (Islamic Azad University, South Tehran Branch, 2006-09-01)
    This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that ...