نمایش مختصر رکورد

dc.contributor.authorSabri-Laghaie, Kamyaren_US
dc.contributor.authorAgah, Mortezaen_US
dc.contributor.authorJafarzadeh-Ghoushchi, Saeiden_US
dc.date.accessioned1399-07-08T17:26:21Zfa_IR
dc.date.accessioned2020-09-29T17:26:21Z
dc.date.available1399-07-08T17:26:21Zfa_IR
dc.date.available2020-09-29T17:26:21Z
dc.date.issued2019-04-01en_US
dc.date.issued1398-01-12fa_IR
dc.date.submitted2019-05-14en_US
dc.date.submitted1398-02-24fa_IR
dc.identifier.citationSabri-Laghaie, Kamyar, Agah, Morteza, Jafarzadeh-Ghoushchi, Saeid. (2019). Performance Evaluation of a Flexible Manufacturing Cell with One Robot and Two Machines. International Journal of Industrial Engineering and Management Science, 6(1), 62-97.en_US
dc.identifier.issn2409-1871
dc.identifier.urihttp://www.ijiems.com/article_88301.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/21009
dc.description.abstractThis study aims to investigate performance of a Flexible Manufacturing Cell (FMC) using stochastic processes approach. The cell under study here is comprised of one robot, two machines and a pallet. The robot working in this cell and also the machines might experience some random failures. As a result, the operations of loading and unloading as well as machining will be delayed until repairing the robots and/or machines. Processing and loading/unloading times have stochastic nature due to existence of different parts and also system operation characteristics. Meanwhile, times between failures of robots and machines are considered stochastic in addition to their repairing times. It has been assumed here that processing times, loading/unloading times, times between two consecutive failures of robots and machines, and required time for their repair obey an exponential distribution. Performance of the cell and optimal capacity of the pallet as well as optimal speed of the robot in terms of cell costs minimization are evaluated.en_US
dc.format.extent1012
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Hormozganen_US
dc.relation.ispartofInternational Journal of Industrial Engineering and Management Scienceen_US
dc.subjectFMCen_US
dc.subjectPerformance Evaluationen_US
dc.subjectQueuing Theoryen_US
dc.subjectStochastic processesen_US
dc.subjectrandom failureen_US
dc.titlePerformance Evaluation of a Flexible Manufacturing Cell with One Robot and Two Machinesen_US
dc.typeTexten_US
dc.typeOriginal Articleen_US
dc.contributor.departmentFaculty of Industrial Engineering, Urmia University of Technology, Urmia, Iranen_US
dc.contributor.departmentIndustrial Engineering Department, Iran University of Science and Technology, Tehran, Iranen_US
dc.contributor.departmentFaculty of Industrial Engineering, Urmia University of Technology, Urmia, Iranen_US
dc.citation.volume6
dc.citation.issue1
dc.citation.spage62
dc.citation.epage97
nlai.contributor.orcid0000-0003-3665-9010


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد