نمایش مختصر رکورد

dc.contributor.authorRastgar, Imanen_US
dc.contributor.authorSahraeian, Rasheden_US
dc.date.accessioned1399-07-09T01:37:36Zfa_IR
dc.date.accessioned2020-09-30T01:37:36Z
dc.date.available1399-07-09T01:37:36Zfa_IR
dc.date.available2020-09-30T01:37:36Z
dc.date.issued2017-06-01en_US
dc.date.issued1396-03-11fa_IR
dc.date.submitted2014-05-29en_US
dc.date.submitted1393-03-08fa_IR
dc.identifier.citationRastgar, Iman, Sahraeian, Rashed. (2017). New Formulation and Solution in PCB Assembly Systems with Parallel Batch processors. Journal of Quality Engineering and Production Optimization, 2(1), 27-46. doi: 10.22070/jqepo.2016.348en_US
dc.identifier.urihttps://dx.doi.org/10.22070/jqepo.2016.348
dc.identifier.urihttp://jqepo.shahed.ac.ir/article_348.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/202889
dc.description.abstractThis paper considers the scheduling problem of parallel batch processing machines with non-identical job size and processing time. In this paper, a new mathematical model with ready time and batch size constraints is presented to formulate the problem mathematically, in which simultaneous reduction of the makespan and earliness-tardiness is the objective function. In recent years, the nature-inspired computational intelligent algorithms have been successfully employed to achieve the optimum design of different structures. Since the proposed model is NP-hard, a metaheuristic algorithm according to a harmony search algorithm is developed and analyzed for solving the batch processing machine scheduling problem addressed in the current paper. Various parameters and operators of the proposed harmony search algorithm are discussed and calibrated by means of the Taguchi statistical technique. In order to evaluate the proposed algorithm, instance problems in concordance with previous research are generated. The proposed algorithm and basic harmony search, improved harmony search and global best harmony search are solved and the results of all the algorithms are compared. The conclusion reveals that the proposed algorithm performs better than the other algorithms.en_US
dc.format.extent1034
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.relation.ispartofJournal of Quality Engineering and Production Optimizationen_US
dc.relation.isversionofhttps://dx.doi.org/10.22070/jqepo.2016.348
dc.subjectbatch processingen_US
dc.subjectharmony search Algorithmen_US
dc.subjectschedulingen_US
dc.subjectTaguchi design of experimentsen_US
dc.subjectparallel machineen_US
dc.titleNew Formulation and Solution in PCB Assembly Systems with Parallel Batch processorsen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentphd student, Department of Industrial Engineering, College of Technology, Mazandaran University of Science & Technology, Babol,en_US
dc.contributor.departmentAssistant Professor, Department of Industrial Engineering, Faculty of Engineering, shahed Universityen_US
dc.citation.volume2
dc.citation.issue1
dc.citation.spage27
dc.citation.epage46


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد