نمایش مختصر رکورد

dc.date.accessioned1399-07-08T17:17:39Zfa_IR
dc.date.accessioned2020-09-29T17:17:39Z
dc.date.available1399-07-08T17:17:39Zfa_IR
dc.date.available2020-09-29T17:17:39Z
dc.date.issued2001-01-01en_US
dc.date.issued1379-10-12fa_IR
dc.date.submitted2013-03-03en_US
dc.date.submitted1391-12-13fa_IR
dc.identifier.citation(2001). The joint probability method of determining the flood return period of a tidally affected pond. Iranian Journal of Science and Technology Transactions of Civil Engineering, 25(4), 599-610. doi: 10.22099/ijstc.2013.1117en_US
dc.identifier.issn2228-6160
dc.identifier.urihttps://dx.doi.org/10.22099/ijstc.2013.1117
dc.identifier.urihttp://ijstc.shirazu.ac.ir/article_1117.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/17546
dc.description.abstractIn this paper a method is presented to determine the return period of flood levels within detention ponds used to store surface water runoff for affected coastal catchments. A simulation method is proposed in probability space based on derivation of the joint probability of occurrence of pond levels by combining the probability of the rainfall inflow hydrograph and peak tidal amplitudes. Each combination of events is then analyzed and the overall pond level statistics of the site produced. The results are to be used in an attempt to produce a rational approach to the problem of the design of detention ponds in coastal regions. The technique was applied to an existing tidally affected pond in Newport in the United Kingdom that is surcharged at the outlet due to the occurrence of tidal fluctuations. The results prove that traditional design assumptions that the peak inflow occurs at the peak high tide are pessimistic and lead to overdesigned systemsen_US
dc.languageEnglish
dc.language.isoen_US
dc.publisherShiraz Universityen_US
dc.relation.ispartofIranian Journal of Science and Technology Transactions of Civil Engineeringen_US
dc.relation.isversionofhttps://dx.doi.org/10.22099/ijstc.2013.1117
dc.subjectRainfallen_US
dc.subjectinflow hydrographen_US
dc.subjectpeak tidal amplitudeen_US
dc.subjectdetention ponden_US
dc.subjectjoint probabilityen_US
dc.titleThe joint probability method of determining the flood return period of a tidally affected ponden_US
dc.typeTexten_US
dc.citation.volume25
dc.citation.issue4
dc.citation.spage599
dc.citation.epage610


فایل‌های این مورد

فایل‌هااندازهقالبمشاهده

فایلی با این مورد مرتبط نشده است.

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد