    Minimizing Total Resource Tardiness Penalty Costs in the Resource Constrained Project Scheduling Problem with Metaheuristic Algorithms

    (ندگان)پدیدآور
    Golestaneh, R.Jafari, A.Khalilzadeh, M.Karimi, H.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    540.7کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In this paper, we study a resource-constrained project-scheduling problem in which the objective is minimizing total Resource Tardiness Penalty Costs. We assume renewable resources that are limited in number, are restricted to very expensive equipment and machines, therefore they are rented and used in other projects, and are not available in all project periods. In other words, there exists a predefined ready-date as well as a due date for each renewable resource type. In this way, no resource is utilized before its ready date. Nevertheless, resources are allowed to be used after their due date by paying penalty costs depending on the resource type. The objective is to minimize the costs of renewable resource usages. We formulated and mathematically modeled this problem as an integer-Linear programming model. Since our problem is NP-hard and also exact methods are only applicable in small scale, therefore metaheuristic methods are practical approaches for this problem; this means that metaheuristics are better for this problem. In order to authenticate the model and solution algorithm in small scale, we consider a network with low activity, and then solve the model of this network with both exact algorithms and SA-GA-TS metaheuristic algorithms. For more activities, as well as getting closer to the real world, we present a Simulated Annealing Algorithm to solve this problem. In order to examine the performance of this algorithm, data that had been derived from studied literature were used, and their answers were compared with Genetic Algorithm (GA) and Tabu Search Algorithm (TS). Results show that in average, quality of SA answers was better than those of the GA and TS algorithms. In addition, we use relaxation method to achieve an even higher validation for the SA algorithm. Finally all results in this paper indicate that both model and solution algorithm have high validity.
    کلید واژگان
    Resource constrained project scheduling
    Resource tardiness penalty costs
    Metaheuristic Algorithms

    شماره نشریه
    3
    تاریخ نشر
    2013-09-01
    1392-06-10
    ناشر
    Ayandegan Institute of Higher Education, Iran
    سازمان پدید آورنده
    Department of Industrial Engineering, University of Science and Culture, Tehran, Iran.
    Department of Industrial Engineering, University of Science and Culture, Tehran, Iran.
    Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran.
    Department of Industrial Engineering, K.N.Toosi University of Technology, Tehran, Iran.

    شاپا
    1925-7805
    1925-7813
    URI
    http://www.riejournal.com/article_47958.html
    https://iranjournals.nlai.ir/handle/123456789/16839

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب