Volume 7, Issue 2
مرور بر اساس
ارسال های اخیر
-
Difference divisor graph of the finite group
(Ayandegan Institute of Higher Education, Iran, 2018-09-01)Let (Zn, +) be a finite group of integers modulo n and Dn a non-empty subset of Zn containing proper devisors of n. In this paper, we have introduced the difference divisor graph Diff (Zn, Dn) associated with Zn whose ...
-
Cloud manufacturing: from a concept to a way for being lean
(Ayandegan Institute of Higher Education, Iran, 2018-09-01)Today, a production enterprise cannot survive without using computer-based machines. Nevertheless, not all enterprises have enough money to invest in such manufacturing resources. On the other hand, handling the resource ...
-
Office chair design: a systematic approach of ergonomic design based on the anthropometric measurement of Bangladeshi people
(Ayandegan Institute of Higher Education, Iran, 2018-09-01)The world of ergonomic evaluation considerate the human biomechanics and anthropometric measurement an integral part of product design and development work. In this paper, we have given an attempt to design an ergonomically ...
-
Simultaneous optimization of quantitative and ordinal responses using Taguchi method
(Ayandegan Institute of Higher Education, Iran, 2018-09-01)In the real world, the overall quality of a product is often represented partly by the measured values of some quantitative variables and partly by the observed values of some ordinal variables. The settings for the ...
-
Fixed point theorems of LW-type Lipschitz cyclic mappings in complete B-metric-like spaces
(Ayandegan Institute of Higher Education, Iran, 2018-09-01)The research of Fixed Point Theorems (FPTs) plays an important role in nonlinear analysis. It is of great theoretical significance and profound application value to study general abstract theory in a B-Metric-Like Space ...
-
Solving a new multi-objective resource constrained project scheduling problem by SAICA and compare it with DE method
(Ayandegan Institute of Higher Education, Iran, 2018-09-01)Nowadays the Resource Constrained Project Scheduling Problem (RCPSP) has triggered a substantially significant issue among scheduling problems. The purpose of RCPSP is minimizing the duration of the projects due to both ...



