• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Scientia Iranica
    • Volume 26, Issue 6
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Scientia Iranica
    • Volume 26, Issue 6
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Integrated bi-objective project selection and scheduling using Bayesian networks: A risk-based approach

    (ندگان)پدیدآور
    Namazian, AliHaji Yakhchali, SiamakRabbani, Masoud
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    2.508 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    This paper presents a novel formulation of the integrated bi-objective problem of project selection and scheduling. The first objective is to minimize the aggregated risk by evaluating the expected value of schedule delay and the second objective is to maximize the achieved benefit. To evaluate the expected aggregated impacts of risks, an objective function based on the Bayesian Networks is proposed. In the extant mathematical models of the joint problem of project selection and scheduling, projects are selected and scheduled without considering the risk network of the projects indicating the individual and interaction effects of risks impressing the duration of the activities. To solve the model, two solution approaches have been developed, one exact and one metaheuristic approach. Goal Programming method is used to optimally select and schedule projects. Since the problem is NP hard, an algorithm, named GPGA, which combines Goal Programming method and Genetic Algorithm is proposed. Finally, the efficiency of the proposed algorithm is assessed not only based on small size instances but also by generating and testing representative datasets of larger instances. The results of the computational experiments indicate that it has acceptable performance to handle large size and more realistic problems.
    کلید واژگان
    Project selection and scheduling
    Risk analysis
    Bayesian Networks
    multi-objective programming
    Genetic Algorithm

    شماره نشریه
    6
    تاریخ نشر
    2019-12-01
    1398-09-10
    ناشر
    Sharif University of Technology
    سازمان پدید آورنده
    Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, P.O. Box 14155-6619, Iran.
    Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, P.O. Box 14155-6619, Iran.
    Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, P.O. Box 14155-6619, Iran.

    شاپا
    1026-3098
    2345-3605
    URI
    https://dx.doi.org/10.24200/sci.2019.21387
    http://scientiairanica.sharif.edu/article_21387.html
    https://iranjournals.nlai.ir/handle/123456789/120061

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب