Determining project characteristics and critical path by a new approach based on modified NWRT method and risk assessment under an interval type-2 fuzzy environment
(ندگان)پدیدآور
Dorfeshan, Y.Mousavi, S.MeysamVahdani, B.Siadat, Ali
نوع مدرک
TextArticle
زبان مدرک
Englishچکیده
In this paper with respect to the importance of risks in real-world projects and ability of interval type-2 fuzzy sets (IT2FSs) to tackle the uncertainty, a new approach is introduced to consider risks and the correlation among risk factors by subjective judgments of experts on the probability and impact under IT2FSs. Furthermore, a new impact function for considering the correlation among the risk factors are extended under an IT2F environment. Moreover, a new subtraction operator is introduced for the critical path analysis. The node-weighted rooted tree (NWRT) method is modified based on the proposed new operator to avoid producing negative number for characteristics of each activity. Also, in order to cope with the uncertainty of the projects, NWRT method is developed under the IT2FSs. Eventually, to illustrate the validity and capability of the proposed method, two examples from the literature are solved and compared.
کلید واژگان
Project schedulingmodified node-weighted rooted tree (NWRT) method
risk factors
interval type-2 fuzzy sets (IT2FSs)
project characteristics
project critical path
Project Scheduling
شماره نشریه
4تاریخ نشر
2019-08-011398-05-10
ناشر
Sharif University of Technologyسازمان پدید آورنده
Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, IranDepartment of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
Full professor, LCFC, Arts et Métier Paris Tech, Centre de Metz, Metz, France
شاپا
1026-30982345-3605
Related items
Showing items related by title, author, creator and subject.
-
On two generalizations of semi-projective modules: SGQ-projective and $pi$-semi-projective
Amouzegar, Tayyebeh (University of Guilan, 2016-12-01)Let $R$ be a ring and $M$ a right $R$-module with $S=End_R(M)$. A module $M$ is called semi-projective if for any epimorphism $f:Mrightarrow N$, where $N$ is a submodule of $M$, and for any homomorphism $g: Mrightarrow N$, ...
-
A Mathematical Model for Project Portfolio Selection with Project Interdependency, Project Divisibility, Reinvestment and Resourcing in Different Ways
Bouyari, Farshad؛ Moussavi, Seyed Meysam؛ Vahdani, Behnam (University of Tehran, 2018-07-01)Project portfolio management consists of repetitive cycles of project assess, selection, and execution. Project portfolio selection is the main part of project portfolio management, where the organization identifies and ...
-
A Systematic Review of Project Risk in Construction Projects
Ardans, Muhammad؛ Hindaryanto, Eko؛ Kurnia, Damar؛ Purba, Humiras (Papyrus Press, 2024-03-01)In recent years, numerous studies published in various journals have highlighted the critical importance of understanding project risk in construction projects. Construction projects are inherently susceptible to a multitude ...