• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Scientia Iranica
    • Volume 21, Issue 3
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Scientia Iranica
    • Volume 21, Issue 3
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem

    (ندگان)پدیدآور
    Jolai, FariborzTavakkoli-Moghaddam, RezaRabiee, M.Gheisariha, E.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    3.281 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In previous investigations in the field of flexible flow shop scheduling problem, rework probability for operations was ignored. As these kinds of problems are NP-hard, so we presented an enhanced invasive weed optimization (EIWO) meta-heuristic algorithm in order to solve the addressed problem with probable rework times, transportation times with a conveyor between two subsequent stages, different ready times and anticipatory sequence dependent setup times. The optimization criterion is to minimize makespan. Although invasive weed optimization (IWO) is an efficient algorithm and has been attracted by many researchers recently, but to increase the capability of IWO, we added mutation operation to enhance the exploration in order to prevent sticking in local optimum. In addition, affinity function is embedded to obstruct premature convergence. With these changes, we balance exploration and exploitation of IWO. Since, the performance of our proposed algorithm depends on parameters values, hence, we applied a popular design of experimental methodology called response surface method (RSM). To evaluate the proposed algorithm, first some random test problems were generated and compared with three benchmark algorithms. The related results were analyzed by statistical tools. The experimental results and statistical analyses demonstrated that the proposed EIWO was effective for the problem.
    کلید واژگان
    IWO
    Flexible flow shop
    response surface methodology
    rework
    transportation time
    anticipatory sequence dependent setup time

    شماره نشریه
    3
    تاریخ نشر
    2014-06-01
    1393-03-11
    ناشر
    Sharif University of Technology
    سازمان پدید آورنده
    Department of Industrial Engineering, University of Tehran,‎ Tehran, Iran
    Department of Industrial Engineering, University of Tehran,‎ Tehran, Iran
    Department of Industrial Engineering, K. N. Toosi University of Technology,‎ Tehran, Iran
    Department of Industrial Engineering, University of Tehran,‎ Kish Int'l Campus, Iran

    شاپا
    1026-3098
    2345-3605
    URI
    http://scientiairanica.sharif.edu/article_3537.html
    https://iranjournals.nlai.ir/handle/123456789/118742

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب