نمایش مختصر رکورد

dc.contributor.authorZiaee, M.en_US
dc.date.accessioned1399-07-08T21:48:49Zfa_IR
dc.date.accessioned2020-09-29T21:48:50Z
dc.date.available1399-07-08T21:48:49Zfa_IR
dc.date.available2020-09-29T21:48:50Z
dc.date.issued2017-04-01en_US
dc.date.issued1396-01-12fa_IR
dc.date.submitted2016-06-01en_US
dc.date.submitted1395-03-12fa_IR
dc.identifier.citationZiaee, M.. (2017). Single machine scheduling problem with convex multi-resource dependent processing times and job deadlines. Scientia Iranica, 24(2), 847-855. doi: 10.24200/sci.2017.4066en_US
dc.identifier.issn1026-3098
dc.identifier.issn2345-3605
dc.identifier.urihttps://dx.doi.org/10.24200/sci.2017.4066
dc.identifier.urihttp://scientiairanica.sharif.edu/article_4066.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/118614
dc.description.abstractIn this paper, the single machine scheduling problem with convex multi-resource dependent processing times, subject to meeting job deadlines is considered. The objective is to minimize the total cost, including the resource allocation costs and the fixed costs. We assume that the actual processing time of each job (task) is a function of the amount of resources allocated. Therefore, the decision variables of the model are: 1) resources allocated to the jobs, 2) total consumed resources, 3) processing times of the jobs, and 4) start/completion times of the jobs. We reformulate and solve the problem using a posynomial geometric programming model. In the proposed exact solution method based on the geometric programming, the original problem of any size is reduced to a two-variable unconstrainted optimization problem which can be easily solved by a simple grid search.en_US
dc.format.extent1174
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherSharif University of Technologyen_US
dc.relation.ispartofScientia Iranicaen_US
dc.relation.isversionofhttps://dx.doi.org/10.24200/sci.2017.4066
dc.subjectSchedulingen_US
dc.subjectSingle machine scheduling problemen_US
dc.subjectConvex multi-resource dependent processing timesen_US
dc.subjectJob deadlinesen_US
dc.subjectPosynomial geometric programmingen_US
dc.subjectIndustrial Engineeringen_US
dc.titleSingle machine scheduling problem with convex multi-resource dependent processing times and job deadlinesen_US
dc.typeTexten_US
dc.contributor.departmentDepartment of Industrial Engineering University of Bojnord, 94531-55111 Bojnord, Iranen_US
dc.citation.volume24
dc.citation.issue2
dc.citation.spage847
dc.citation.epage855


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد