An Imperfect Multi-Item Single Machine production system with Shortage, Rework, and Scrapped Considering Inspection, Dissimilar Deficiency Levels, and Non-Zero Setup Times
(ندگان)پدیدآور
Nobil, Amir HosseinAfshar Sedigh, Amir HoseinTiwari, SunilWee, Hui Mingنوع مدرک
TextArticle
زبان مدرک
Englishچکیده
In this paper, we consider a deficient production system with permissible shortages. The production system consists of a unique machine that manufactures a number of products that a part of them are imperfect in form of rework or scrap. These defective products are identified by 100% inspection during production, then, they are whether reworked or disposed of after normal production process. Like real-world production systems, there are diverse kinds of errors creating dissimilar breakdown severity and rework. Moreover, reworks have non-zero setup times that makes the problem closer to real-world instances where machines require some preparations before starting a new production cycle. Thus, we introduce an economic production quantity (EPQ) problem for an imperfect manufacturing system with non-zero setup times for rework items. The rework items are classified into several categories based on their type of failure and rework rate. The aim of this study is to obtain optimum production time and shortage in each period that minimizes inventory system costs including setup costs in reworks, holding costs, production costs, inspection costs, disposal costs, and shortage. Finally, a numerical example is proposed to assess efficiency and validation of the proposed algorithm.
کلید واژگان
Lot sizingimperfect manufacturing
multiple rework
single machine
exact algorithm
Optimal Production and Maintenance Control
شماره نشریه
1تاریخ نشر
2019-02-011397-11-12
ناشر
Sharif University of Technologyسازمان پدید آورنده
Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, IranInformation Science, University of Otago, Dunedin, New Zealand
The Logistics Institute-Asia Pacific, National University of Singapore
Industrial Engineering Department, Chung Yuan Christian University, Taoyuan city, Taiwan
شاپا
1026-30982345-3605




