    Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations

    (ندگان)پدیدآور
    Nabipoor Afruzi, ElhamAghaie, AbdollahNajafi, Amir Abbas
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    3.488 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    This paper studies the multi-project scheduling problem which involves multiple projects with different importance weight; with predefined assigned due dates; with activities that have uncertain durations; and with renewable resources that are constrained. The resource sharing policy is applied to share the resources among projects. Due to the environmental rapid changes and also the uniqueness of projects, the probability distribution function of uncertain durations cannot be estimated with confidence. Besides, the multi-project scheduling problem with its large scale investment dictates a conservative approach to deal with the existing uncertainty. Therefore, the Robust Resource-Constrained Multi-Project Scheduling Problem (RRCMPSP) is studied in this paper while the maximum total weighted tardiness of the projects should be minimized. A scenario-relaxation algorithm is implemented which results in optimal solutions for the RRCMPSP. The aim is to find an optimal structure containing all the projects in such a way that it transfers the resources between the activities based on the resource sharing policy while the maximum weighted differences between the projects finish times and their assigned due dates will be minimum.
    کلید واژگان
    Multi-Project Scheduling Problem
    Resource Sharing Policy
    robust optimization
    Resource Constraint
    Uncertain Activity duration
    Industrial Engineering

    شماره نشریه
    1
    تاریخ نشر
    2020-02-01
    1398-11-12
    ناشر
    Sharif University of Technology
    سازمان پدید آورنده
    Faculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran 1999143344, Iran
    aculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran 1999143344, Iran
    Faculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran 1999143344, Iran

    شاپا
    1026-3098
    2345-3605
    URI
    https://dx.doi.org/10.24200/sci.2018.20801
    http://scientiairanica.sharif.edu/article_20801.html
    https://iranjournals.nlai.ir/handle/123456789/118405

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب