In most construction projects, human resources account for 30 to 50 percent of all project costs, thus it is an important cost element in construction projects. However, the complexities and uncertainty of work ow have made it di cult to predict human resource costs. The most e ective and economic management approach is computer simulation which has a better ability to understand and identify the dynamics and statics of a case research system. One of the steps of simulation is modeling, and choosing the best modeling approach for prediction is very important. Agent-based modeling, which is referred to by some as a third way of doing science", was chosen to predict labor cost impacted by many factors in the work flow. In our research, the increased labor cost, based on factors a ecting work ow, is 16 percent on average, which is predicted more accurately by the simulated model than by planned cost.
کلید واژگان
Agent-based modelingSimulation
construction
Labor costs
AnyLogic
شماره نشریه
1تاریخ نشر
2016-02-011394-11-12
ناشر
Sharif University of Technologyسازمان پدید آورنده
School of Civil Engineering, Iran University of Science and Technology, Tehran, IranSchool of Civil Engineering, Iran University of Science and Technology, Tehran, Iran
School of Civil Engineering, Islamic Azad University, Arak Science & Research Branch, Arak, Iran
شاپا
1026-30982345-3605