نمایش مختصر رکورد

dc.contributor.authorدزفولیان, حمیدرضاfa_IR
dc.contributor.authorسموئی, پروانهfa_IR
dc.contributor.authorشیخی, مهدیهfa_IR
dc.date.accessioned1404-03-11T05:57:23Zfa_IR
dc.date.accessioned2025-06-01T05:57:23Z
dc.date.available1404-03-11T05:57:23Zfa_IR
dc.date.available2025-06-01T05:57:23Z
dc.date.issued2025-04-01en_US
dc.date.issued1404-01-12fa_IR
dc.identifier.citationدزفولیان, حمیدرضا, سموئی, پروانه, شیخی, مهدیه. (1404). شناسایی و رتبه‌بندی ریسک‌های زنجیره تأمین برق با استفاده از جمع‌سپاری و روش تصمیم‌گیری چند معیاره آراس. نشریه کیفیت و بهره وری صنعت برق ایران, 14(1), 1-8.fa_IR
dc.identifier.issn2322-2344
dc.identifier.issn10
dc.identifier.urihttp://ieijqp.ir/article-1-985-fa.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/1168703
dc.description.abstractThe electricity supply chain is one of the main infrastructures of every country, which guarantees economic, industrial and agricultural growth, and its development is the priority of the country's plans. This supply chain is made up of different levels and at each level human resources with special expertise are working. Due to the dynamics of the environment and changes in exchange rates, this chain is facing many risks that the correct identification of these risks and their evaluation and prioritization in the program Supply chain network planning is very effective. In this article, which is carried out with the purpose of applied research and in the category of survey research-case study, in the first stage to identify the risks of the electricity supply chain, the guided-participatory crowdsourcing method in which the topic of crowdsourcing is quite specific, and its participants are all related people is used. In the following, using four criteria selected by experts and using the ARAS method for multi-criteria decision making, the risks are prioritized, and finally, the most important supply chain risks are determined according to the points obtained from the ARAS method, so that should be taken into consideration for planning. The highest priority is given to the risk of theft of cables and metal parts, and since cables and metal parts are the main components of the energy transmission network and are used at all levels of the network, they are the most important cause of disruption in electricity. Unforeseen supply and shutdowns should be considered.  fa_IR
dc.format.extent535
dc.format.mimetypeapplication/pdf
dc.languageفارسی
dc.language.isofa_IR
dc.publisherانجمن مهندسی بهره وری صنعت برق ایرانfa_IR
dc.relation.ispartofنشریه کیفیت و بهره وری صنعت برق ایرانfa_IR
dc.relation.ispartofIranian Electric Industry Journal of Quality and Productivityen_US
dc.subjectریسکfa_IR
dc.subjectزنجیره تأمین برقfa_IR
dc.subjectجمع‌سپاریfa_IR
dc.subjectآراسfa_IR
dc.subjectصنایع و مدیریتfa_IR
dc.titleشناسایی و رتبه‌بندی ریسک‌های زنجیره تأمین برق با استفاده از جمع‌سپاری و روش تصمیم‌گیری چند معیاره آراسfa_IR
dc.typeTexten_US
dc.typeپژوهشيfa_IR
dc.contributor.departmentدانشگاه بوعلی سیناfa_IR
dc.contributor.departmentدانشگاه بوعلی سیناfa_IR
dc.contributor.departmentدانشگاه بوعلی سیناfa_IR
dc.citation.volume14
dc.citation.issue1
dc.citation.spage1
dc.citation.epage8


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد